equipment
At Coral Coast Oceaneering, we possess the necessary equipment to effectively deliver on a wide range of projects. Our equipment is well maintained and we are continually upgrading and replacing our stock as required.
We own and operate all our marine and civil plant equipment, extending to:
occupational diving equipment
Recompression chamber
Kirby Morgan 37 / 18 diving helmets
Kirby Morgan divers control panels
Kirby Morgan diver communication system
Out-land underwater video systems
Salvage lift bags and pumps
Hydraulic tools
Underwater cutting and wet welding equipment
Air supply station
Mobile dive systems and site dive systems
marine fleet
22m tug
Crane / piling barge
Heavy lift barge (100t)
Excavator mounted barge
Numerous work / dive vessels
Flat top barges
civil equipment
30t excavators with standard and long reach capability
Excavator attachments available
HDPE pipe welding machine
Excavator-mounted piling equipment
Hydraulic auger motor and auger bits
Shute harbour marine base
7000 square meters of hard stand area
150 lineal meters of wharf frontage
Fabrication workshop
jubilee pocket workshop
2000 square meters of land
700 square meters of undercover workshop
Bending and punching machinery
400CMF compressor
Band saw
Lathe
Mig and tig welding machines
Mobile welding machines
Hydraulic power packs (330L per minute at 200 bar)